“If geothermal is so efficient, why wouldn’t I use it?”

It’s a reasonable question, particularly when you’re planning a major investment in your building.

I’ve spent much of my engineering career working with ground-source heat pump systems. I believe strongly in what they can accomplish. But that doesn’t mean I start every project assuming geothermal is the answer.

After more than 40 years in engineering, I want to understand the owner’s goals, the building, and the available energy resources before recommending a system.

Geothermal should earn its place in your project through that evaluation.

Start by defining what better means

A property owner might tell me, “I want the best heating and cooling system.”

My next question is: What does “best” mean to you?

Lowest installation cost? Lower energy bills? Reduced carbon emissions? Dependable operation? The lowest total cost over the years you’ll own the building?

Those priorities can lead to different recommendations.

I ask owners to identify their number one goal in writing. We can pursue several benefits, but we need a clear priority when decisions compete.

Sometimes the response is, “I have a fixed budget, and I want geothermal to handle everything without boilers or cooling towers.”

That gives us a budget and a preferred approach. We still need to understand the purpose behind it. Is eliminating combustion the priority? Avoiding cooling-tower maintenance? Reducing operating costs?

Understanding why helps us evaluate whether the proposed approach actually delivers what the owner values.

Know Better System

You may hear someone say there’s “no better system” than the one they recommend.

I prefer to approach that statement as “Know Better System.”

Know your building better. Know your options better. Understand the costs and operating requirements well enough to choose with confidence.

Before I can recommend a better system, I need to know what it must accomplish.

That’s particularly important with geothermal. A heat pump’s efficiency rating cannot tell us whether the complete installation is the right investment for your property.

The building may change the answer

For an existing building, I usually start on the inside and work out.

What equipment is there now? How is heating and cooling delivered? What can we reuse, and what needs to change?

Consider a building whose heating system depends on very hot water. A heat pump conversion may require changes to the equipment delivering heat to the rooms. Those changes belong in the project budget.

Electrical capacity, equipment space, and construction disruption also matter.

Timing matters, too. Equipment approaching replacement creates a different opportunity than equipment installed recently. The comparison should account for what the owner would otherwise need to spend.

Sometimes the most useful first investment is reducing the building’s heating and cooling needs. Better insulation, air sealing, or controls may allow a smaller replacement system.

I want to understand those opportunities before we commit to the size or type of system.

The ground is one available resource

Geothermal heat pumps move heat into and out of the ground through buried piping. But the ground is only one place to obtain heat or send heat the building needs to remove.

Depending on the property, we may also evaluate surface water, wastewater, outdoor air, or heat available from another part of the building.

Each resource comes with questions about availability, access, maintenance, and cost.

A property with limited drilling space may still have useful options. Conversely, a large open site doesn’t automatically make a ground loop economical.

We need to understand underground conditions, utilities, drilling access, and future construction plans.

The evaluation should explain what the site can reasonably support before the owner commits to a particular design.

A combined approach may serve the owner better

A building’s largest heating or cooling demand may occur during a relatively small number of hours each year.

Designing the ground loop to handle every extreme condition can require an investment that deserves careful examination.

One option is a combined, or hybrid, system. The ground loop serves part of the demand, while another resource or piece of equipment handles selected conditions.

In the geothermal system I designed for Methodist Le Bonheur Healthcare’s Olive Branch Hospital in Mississippi, we incorporated an entirely dry cooler. It provided another way to reject heat without relying on water evaporation.

That illustrates why I evaluate combinations of resources. The useful question is how each component contributes to the owner’s goals and the performance of the complete system.

A combined approach still needs sound engineering. Additional equipment brings controls and maintenance requirements that must be understood.

When I would pause a geothermal recommendation

I would want more evaluation before recommending geothermal if:

  • Building modifications make the complete project difficult to justify.

  • Site conditions create substantial cost or construction uncertainty.

  • The budget cannot support a properly designed and completed installation.

  • Another available thermal resource appears better suited to the building.

  • The projected benefits depend on assumptions we haven’t verified.

Any of these findings may lead to a different system, a phased conversion, or additional investigation.

Discovering a limitation early is useful. It gives the owner choices while there is still time to change direction.


Make the decision before making the commitment

My Project Energy Roadmap brings these questions together: the owner’s priorities, the building’s needs, available thermal resources, site suitability, and the engineering needed to support the next decision.

The outcome may support geothermal. It may support a combined approach or another heating and cooling solution.

I’m comfortable with any of those outcomes when the reasoning is sound.

That’s what I mean by Know Better System: understand the project well enough to make a better decision.

If you’re considering geothermal, let’s start with your building and what you want to accomplish.

Schedule a Consultation or Learn About the Project Energy Roadmap to understand the evaluation process.

Previous
Previous

What Does a Commercial Geothermal System Really Cost?

Next
Next

7 Costly Geothermal Mistakes That Can Derail Your Project