A geothermal system can be running, keeping the building comfortable, and still costing far more to operate than it should.
Other problems take longer to show up. A system performs well for years, then struggles after a building addition or a change in operating hours.
After more than 40 years designing, reviewing, commissioning, and teaching ground-source heat pump systems, I’ve learned to pay particular attention to the decisions behind the equipment.
These seven mistakes can affect project cost, reliability, and long-term value. Owners don’t need to become geothermal engineers to avoid them. They do need to ask the right questions.
1. Starting design before defining success
“We want geothermal” tells me what technology you’re interested in. It doesn’t tell me what you want the investment to accomplish.
Are you trying to reduce energy bills? Eliminate on-site combustion? Avoid cooling tower maintenance? Achieve the lowest total ownership cost?
Those goals can lead to different designs.
I ask owners to identify their number one goal in writing. Then we establish measurable expectations and a budget.
If your goal is full ground-source coverage without boilers or cooling towers, we also need to define which loads are included and what happens if the budget won’t support that approach.
That conversation belongs before we start sizing the ground loop.
2. Assuming the site will work
An open lawn or parking lot doesn’t tell us everything we need to know about a geothermal site.
We need to investigate drilling access, underground utilities, ground conditions, permitting, and future construction plans.
On one Michigan middle school project, our drilling contractor encountered pockets of natural gas. We ultimately made the remaining boreholes shallower and added more to complete the installation.
The project was completed successfully, but it was a clear reminder that underground conditions deserve attention.
For larger projects, a test bore and thermal response test can help establish how effectively the ground transfers heat.
I also want to know what other thermal resources are nearby. Wastewater, surface water, or heat rejected by another building may change the best approach.
3. Choosing a system the owner cannot operate
Additional equipment and sophisticated controls can improve performance. They also require people who understand how to operate and maintain them.
Early in my career, I returned to a school with temperature-control complaints. The facility manager had disconnected the automatic controls and was adjusting the system manually several times a day.
That wasn’t a geothermal project, but the lesson applies directly: involve the people who will operate the building during design.
Ask who will maintain the system, what training they need, and what service support will be available.
Every added component should have a clear purpose. If complexity is justified, its ongoing care belongs in the budget.
4. Getting today’s and tomorrow’s loads wrong
Selecting heat pumps requires understanding the building’s peak heating and cooling needs. Designing the ground loop also requires understanding how much heat moves into and out of the ground throughout the year.
Future changes matter, too.
A geothermal high school we designed operated well for years. Later, the district added an indoor pool, another gymnasium, and expanded other spaces without increasing the borefield.
Within a year, the ground loop was overheating, and heat pumps were shutting down. Additional borefield capacity resolved the problem.
Before approving a design, ask whether it accounts for operating hours, planned additions, and changes in building use.
A building expansion needs an energy-system evaluation, even when the existing equipment appears to have spare capacity.
5. Paying too little attention to piping and pumps
The heat pumps can be efficient while the complete system wastes energy.
Circulating pumps move fluid between the building and the ground loop. Poor piping arrangements, excessive flow, or unsuitable pump selections can consume a substantial share of the anticipated savings.
I learned this on a very large geothermal high school project. We ended up with circulating pumps much larger than they could have been. Some of the potential energy savings went into unnecessary pumping energy.
Owners should ask a straightforward question: Does the efficiency analysis include the electricity used by the circulating pumps?
The engineering also needs to address fluid selection, air removal, cleaning, and operation when only a small portion of the building needs heating or cooling.
6. Treating commissioning as a paperwork exercise
Commissioning means verifying that the installed system actually works as intended.
That includes the underground installation, pumps, valves, sensors, and control sequences.
One middle school opened successfully after summer commissioning. In November, the superintendent called with an unusual question: Was the geothermal borefield supposed to melt the snow on the football field?
The emergency boilers had been programmed to keep the loop warm, using a conventional heat pump control approach. They were sending unnecessary heat into the ground.
Correcting the boiler controls solved the problem.
A successful summer startup hadn’t verified winter operation.
Require construction records, installation verification, functional testing, operator training, and follow-up testing under seasonal conditions.
7. Walking away without monitoring performance
Keeping the building comfortable doesn’t prove the system is meeting its energy goals.
Ground-loop temperatures can change gradually. Controls can be overridden. Building loads can increase.
Without operating records, those changes may go unnoticed until bills rise or equipment shuts down.
I routinely include temperature sensors and flow measurement so the owner can track what the building and borefield are doing. Electrical metering helps establish how efficiently the complete system operates.
Someone also needs responsibility for reviewing that information and responding to problems.
Ask what will be monitored, who will review it, and how performance will be compared with the design expectations.
Start with a Project Energy Roadmap
Several of these mistakes begin before detailed design. That’s when owners have the greatest opportunity to influence the outcome.
My Project Energy Roadmap helps establish the building’s needs, the available thermal resources, site limitations, and the further engineering needed to make a sound decision.
If you’re considering geothermal, or questioning how an existing system is performing, let’s discuss your building and your goals.
Schedule a Consultation or Learn About the Project Energy Roadmap to understand the evaluation process.