“Is geothermal worth it?”
It’s a fair question. If you’re considering a significant investment in your building’s heating and cooling, you want to know what you’ll get for your money.
My answer is that geothermal can be an excellent investment. Whether it makes sense for your property depends on the building, the site, the funding, and what you want to accomplish.
After more than 40 years in engineering, I’ve learned to start with questions. Before recommending a ground-source heat pump system, I want to understand how your building works and what a successful project would look like to you.
Usually, I start on the inside and work out.
Start with the building you already have
For an existing building, my first question is simple: What’s there now?
The heating and cooling equipment matters, but so do the systems that deliver comfort throughout the building. Can the existing ductwork or water piping be used? Is there room for replacement equipment? Can the electrical service support the proposed changes?
These questions can have a substantial effect on the cost and practicality of a geothermal conversion.
For example, a building with equipment approaching replacement presents a different opportunity than one with recently installed equipment. In the first case, we’re already facing a capital expense. We can compare geothermal with the cost of the replacement system the owner would otherwise purchase.
I also want to understand how much heating and cooling the building needs, and when it needs it. A school, an office, and a building operating around the clock can have very different energy-use patterns.
Project size alone won’t tell us whether geothermal is worthwhile. We need to understand the work the system will be doing.
Look at the site and its available heat sources
A ground-source heat pump moves heat. During heating, it draws heat from a source outside the building. During cooling, it moves heat out of the building to somewhere that can accept it.
The ground often serves both purposes through buried piping, commonly called a ground loop.
For a vertical ground loop, I want to know whether there’s room to bring in a drill rig and install boreholes. We also need to consider underground utilities, access, ground conditions, and plans for future construction.
But the evaluation shouldn’t end at the property line or with a quick look at available lawn area.
In the discussion for your project, I may ask about nearby surface water, flowing water, wastewater, or other available sources of heat. These resources require their own evaluation, including access, permissions, seasonal availability, and maintenance needs.
I think of this as taking inventory of the property’s thermal assets: places where we can obtain useful heat or send heat we need to remove.
Limited drilling space may change the solution. It deserves investigation before we rule out the opportunity.
Decide what you want the project to accomplish
This is one of the most important conversations we’ll have.
When you say you want a “better” heating and cooling system, what does better mean?
You might want to:
Spend the least amount possible on installation.
Reduce annual energy bills.
Reduce carbon emissions.
Achieve the lowest total cost over the years you’ll own the property.
Improve reliability and comfort.
All are reasonable goals. They can lead to different design decisions.
The lowest installation cost may come with higher operating expenses. A project focused on reducing carbon emissions may justify an investment that an owner focused on near-term savings would decline.
Decarbonization simply means reducing the carbon emissions associated with operating your building. If that’s your priority, we need to evaluate it explicitly, including the electricity the proposed system will use.
I ask owners to identify their number one goal in writing. We can still pursue the other benefits, but a clear priority gives us a way to make decisions when cost, performance, and preferences compete.
Otherwise, we can spend a great deal of effort designing a system without agreeing on what it needs to achieve.
Evaluate the funding and the long-term costs
A technically sound project still needs a workable financial plan.
Does the owner have the funds available? Will financing be needed? Are there incentives the project qualifies for, and when would those funds become available?
Those answers belong in the evaluation early.
When comparing geothermal heating and cooling costs, I also want the comparison to include the complete project. Building modifications, electrical work, controls, and site restoration can matter just as much as the equipment price.
Then we look beyond installation.
What will each option cost to operate and maintain? What equipment replacements should we anticipate? How long does the owner expect to hold the property?
That’s the purpose of a lifecycle cost evaluation: comparing the costs of owning and operating the alternatives over an agreed period.
An attractive annual savings estimate is useful only if the assumptions behind it fit your building and your plans.
Recognize when geothermal needs a different approach
Sometimes the evaluation points toward a straightforward geothermal system. Other times, building modifications, site limitations, or funding constraints make the proposed approach difficult to justify.
The next step might be a phased conversion, a combination of thermal resources, or another heating and cooling option.
I’m comfortable with that outcome. Finding a limitation early gives the owner useful information before committing to detailed design or construction.
The value of an evaluation comes from understanding the choices well enough to make a sound decision.
Take the next step with a Project Energy Roadmap
My Project Energy Roadmap brings these questions together: what the building needs, what resources are available, what the site allows, and what further engineering is warranted.
It gives us a practical basis for deciding how to proceed.
If you’re wondering whether geothermal is worth it for your property, let’s start with your building and your goals.